Chart Of Usage - Pfeifer MPS 1 Originalbetriebsanleitug

Tragklemmen/zangen
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

8. Chart of usage

Load position
Load
Sheet / Girder
Process
90° turning
Usage at the Load
NM, SP
ASTS**
G2
SCP
SCPA***
MPC 1, MPC 2,
KL, CA*, CS
MPS 1, MPS 2
Loadposition
Inherent single
Load
sheets /sheet
Process
In slings at least
Usage at the load
H, HS, WHS
M*
SZ, SZA
RPZ
B 1, B 2
* Also suitable for thin sheets
** In case of girder transport near ground allowed with one grab only
*** Lifitng (lateral attachment), as long as a spreader beam is used assuring direct lift upward.
**** Weight of load must correspond to at least 10% of the carrying capacity stated.
PFEIFER lifting clamps & grabs 04/2017 V 4.0 / Subject to technical changes!
8
Vertical (upright)
Sheet / Girder
lifting,
lifting,
180° turning
8
8
8
8
8
8
8
8
8
8
Girders (upright)
stacks
Lifting
Lifting
In pairs
3 pcs.
8
8
8
Horizontal (sleeping)
Sheets
Girder
lifting
Lifting
(attach laterally)
In pairs
In pairs
8
8
8
8
8
8
8
Horizontal (sleeping)
Girder
Rail Profiles
(upright / sleeping)
Lifting, diagonal
Lifitng
and longitudinal
(attach laterally)
pulling
In pairs
8
8
Girder
90° Turning
Min. 10 % of
nominal load
necessary!
****
8
8
8
8
8
8
8
8
8
8
Round material
Rigid attachment
Lifting
point at
ceiling girder
8
8

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis