Initial Operation - oventrop Regusol X-Uno 15 Montage- Und Bedienungsanleitung

Stationen für die solarthermie
Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

6 Initial operation

!
ATTENTION!
Damage to property through oper-
ating error!
Operating errors and an incomplete
installation may cause malfunction
and damage to property!!
For this reason:
Before initial operation, the following
conditions are to be checked:
– All ball valves must be completely
opened!!
– All check valves must be closed!
– Primary and secondary circuit must
be filled completely and be bled
correctly
The Regusol X stations are pressure tested when
leaving the factory. Before initial operation, the
complete system however has to be subjected to
a leakage test.
Initial operation
121
Inhaltsverzeichnis
loading

Inhaltsverzeichnis